The cable is laid layer by layer and with great care on several large cable drums, on deck or inside the cable layer (not wound!).
During use, the speed of the cable layer must be precisely matched to the nature of the seabed in order not to damage the cable. A complex control system matches the speed of the vessel above ground (measured nowadays by means of an on-board GPS receiver) and the speed at which the cable is removed from the cable drum. In addition to the force acting on the cable and the angle of immersion of the cable, this control takes into account the water depth and the elevation profile of the route.
The submarine cable laid by the cable ship is then flushed into the seabed, especially near the coast, by the cable laying plough using water jets. The submarine cable is thus better protected against damage by anchors, trawls and other equipment.
This model of a coastal cable ship named "Nicola Tesla" (famous inventor, who also invented the alternating current) drives for the fictitious company "Atlantic Cabel".
The model is suitable for P3D from version 4.X and higher and has static and dynamic lighting.
Further information about the ship, the routes and the installation can be found in the manual (included in download).
For questions about the models/sceneries please use the support section in the forum.
Es steckt sehr viel Arbeit und Liebe in den Modellen und Szenerien und es wäre sehr nett, wenn Du dies mit einer Spende honorieren würdes.
Darüber hinaus hilft mir Deine Spende bei der Entwicklung weiterer Modelle und Addon. DANKE!
-
Version 1.0.0
-
Fischkopp -
5. Januar 2022 um 11:44 -
9,05 MB -
26 Downloads
-